Project Log Book / Commercial & Industrial
Structural Concrete Repair
High-Strength Slab Reconstruction with Steel Reinforcement
Phase 01 / Demolition & Preparation
Slab Remediation & Compromised Material Removal
Addressing structural failures in the original concrete slab caused by impact or extreme loading, we executed precise diamond blade perimeter sawing followed by deep mechanical demolition. Defective materials were thoroughly cleared, and the sub-grade was re-leveled to eliminate deflection issues prior to the new pour.
Phase 02 / Reinforcement & Pouring
Structural Steel Grid Integration
To ensure the newly reconstructed patch withstands high-impact industrial loads and continuous heavy forklift operations, an engineered steel reinforcement framework was integrated. High-density concrete was then technically poured and micro-leveled using professional magnesium hand floats to achieve a flush, flat transition with the existing surface.